Name and location
Bridge over T-310 road in the municipality of Pratdip (Tarragona), to link the partial plans of Tarraco and Bonmont Pinars-Terres Noves
Key features
Bow-String with two lateral free arcs
Length: 55.25 m
Average height: 7m
Use: Road
Materials: Arches of structural steel, composite structure concrete-steel for the deck
Construction: Erection on place with provisional supports.
Property
MedGROUP.
Intervention
Construction Project for MedGroup.
General Information

Tied arch bridge with bottom deck over the road T-310 in the municipality of Pratdip (Tarragona). Spanning 55.25m, the bottom deck is suspended from two offset longitudinally free arches to adapt to skew of the road plan.
The bridge is built on a link ofdifferent levels of partial plans, Terres Noves Bonmont the road T-310, and also serves as a connection between two phases of real estate to be developed in the area. Given the nature of real estate to be developed, the property asked to Bridge Technologies SL the design of a emblematic structure to act as a symbol of urbanization.
The static scheme is the classic for this type of bridge, with the arcs connected at the ends to the composite deck, which acts as tie, and with the deck also suspended to the arches by means of hangers, so thatis transmittedto the foundationonlyvertical reactions
The platform is suitable for 2 lanes of 3.5m wide, plus two 0.50my shoulders and for a pedestrian promenade of 3.75m wide, physically separated from traffic by one of the arches.
Planos

|
MED GROUP 2 – 1 |
Download PDF |
|
MED GROUP 2 – 2 |
Download PDF |
|
MED GROUP 2 – 3 |
Download PDF |
|
MED GROUP 2 – 4 |
Download PDF |


