FCC Construcción has received New Civil Engineering Tunnelling award for the Bolaños Tunnel, bored using TBM. Tunnel and Bridge Technologies provided technical support to these works, which consisted in the complete design of the precast tunnel segments, and also of the cut and cover tunnels situated at the extremes of the main tunnels. FCC’s award submission highlighted its innovative solution for the treatment of collapsed material, as well as the dual-component backfilling mortar injection system and the mixed-drilling system.
- Home
- About Us
- Services
- Detailed Design of bridges and viaducts
- Underground Construction
- Independent checking of projects
- Consultancy on Bridge Design
- Construction Engineering
- Structural Assessment and Retrofitting of Bridges
- Condition Evaluation & Inspection of bridges
- Consultancy on special issues
- Advanced Structural Analysis
- All Services
- International Presence
- Projects
- News
- Contact